JilERP®
Manufacturing · JilERP

Move production forward with the right context.

BOMs, Material Requirements Planning (MRP), manufacturing orders and actual costs.

Engineer in a research facility
IN YOUR DAILY WORK

In practice, for your teams.

Net requirements calculated, manufacturing order released: reserve materials, schedule workstation capacity and track actual versus standard production costs.

THE SCOPE

The tools to get things done.

  • Multi-level bills of materials (BOM) and engineering versioning
  • Routing operations, visual workflows and work centers
  • Material Requirements Planning (MRP) and Master Production Schedule (MPS)
  • Manufacturing orders (planned and released work orders)
  • Automatic component and raw material reservation in stock

  • Capacity Requirements Planning (CRP) and shop-floor load balancing
  • Manufacturing cost calculation (Standard vs actual incurred costs)
  • Tracking of actual material consumption and labor hours
  • In-line quality control checkpoints at critical stages
  • Direct synchronization with shop-floor terminals via JilMES
CONNECTED BY DESIGN

The modules that support your work.

YOUR NEXT STEP

Start with what matters to you.

Select your modules. Shape your workspace. Move your project forward.

Build my workspace